AMP Transmission (AMPT) is proposing the Brewster Second Source Reinforcement Project to improve reliability for the customers in the Village of Brewster and surrounding areas.

Project Details

The Brewster Second Source Reinforcement Project involves the expansion of the 69/12-kilovolt (kV) Brewster Substation on the south side of the village and the construction of a new 69-kV transmission line (approximately 5.5 miles) between the Brewster Substation and the new Alpine Substation, owned by American Electric Power and located west of Wilmot, Ohio.

Stakeholder Engagement

AMPT is holding two in-person open houses to receive public input. The community will be able to view detailed maps and talk with AMPT representatives about the proposed study segments.

The open houses will take place:

  • 5:30 p.m.-7:30 p.m., Tuesday, June 11, 2024 at the Amish Door (Milana Ballroom),  1210 Winesburg Street, Wilmot, Ohio
  • 5:30 p.m.-7:30 p.m., Wednesday, June 12, 2024 at the Fairless High School Gymnasium, 11885 Navarre Road SW, Navarre, Ohio

The community is also invited to provide their contact information and public comments regarding the proposed study segments via email to AMPT at [email protected]

Project Documents

Brewster Fact Sheet